
Add to Cart
All stainless steel 304 and electric heating 200L Brewhouse
200kg/h, double rollers malt mill
200LMash/lauter, kettle/whirlpool+plate heat exchanger
200L Fermentation tanks + brite beer tanks
500L Glycol tank+chiller
50L CIP, alkali+acid+electric heating
Control cabinet, manual, automatic control seperately
Keg system
Brew House | Beer Tank | Support Equipments | SS Keg | Kegging line |
100L to 5000L | 100L to 20000L
| / | DIN 20L,30L, US 1/6, 1/4,1/2bbl. Euro 20L,30L,50L. | 60-80kegs per hour |
Single Two vessels, Combined Two vessels Three vessel, Four vessels or Customized | Concial / Horizontal | Malt mill, hot liquor and glycol tanks, plate heat exchanger,steam generator, CIP system, PLC contro system. | / | Single station, Doubel station
Conbained system |
1. Brewhouse: two vessels, three vessels, four vessels brewhouse
2. Heating medium: steam heating
3. Insulation material: rock wool. Insulation thickness: 100mm
4. Mash tank; hydrator, mixer, steam heating jacket
5. Lauter tun: rake, agitator, false bottom, hydrator
6. Brewkettle, steam heating jacket, inner steam heating deivce
7. Whirlpool tun: whirlpool entry
Technological specification
Outside surface | Stainless steel or red copper,THK:2mm |
Inner surface | S.S.304,THK:3mm |
Top shape | Seal head or conical head |
Heating method | electricity/Steam |
Insulation layer | Protected by polyurethane,THK:70-100mm |
Polishing | ≤0.4µm |
Manhole | Side upward or your requirements |
Plate heat exchanger | 4m² |
Agitator | Raking system conneted into a top reducer |
The output of Beer making machinery pls as a reference
Daily output | 100L | 200L | 300L | 500L | 600L | 800L | 1000L | 2000L | 3000L | 5000L |
unit type | SL100 | SL200 | SL300 | SL500 | SL600 | SL800 | SL1000 | SL2000 | SL3000 | SL5000 |
floor space | 15m² | 20m² | 25m² | 45m² | 55 m² | 70m² | 80m² | 120m² | 150m² | 250m² |
power | 8KW | 12KW | 20KW | 35KW | 35/15KW | 35/15KW | 35/15KW | 65/15KW | 65/15KW | 65/15KW |
Beer production period | 10-12/ days | 10-12/ days | 10-12/ days | 10-12/ days | 10-12 /days | 10-12 /days | 10-12 /days | 10-12 /days | 10-12 /days | 10-12 /days |
TERMS
Trade term: FOB Qingdao
Packing: Iron frame+wood box, suitable for long shipping transportation
Payment, 50% in advance as depsoit, the balance before the delivery
Delivery, 30 working days after the deposit arrival
Warranty: 5 years for main body, 6 months for electrical componets andparts